FOREST HARVEST SCHEDULING PLAN INTEGRATED TO THE ROAD NETWORK

dc.creatorPedro Henrique Belavenutti Martins da Silva
dc.creatorJulio Eduardo Arce
dc.creatorGustavo Valentim Loch
dc.creatorHassan Camil David
dc.creatorLuan Demarco Fiorentin
dc.date2016
dc.date.accessioned2026-07-07T02:41:28Z
dc.descriptionIn industrial forest plantations, the spatial distribution of management units for harvest scheduling influences the timber production cost and the nonrenewable resources consumption, due to issues related to transport logistic. In this context, this research aimed to formulate Integer Linear Programming (ILP) by means of the application of Floyd-Warshall network optimization algorithm to generate timber production routes, minimizing the production costs resulting from harvest activities and forest road maintenance. Then, scenarios were simulated considering different minimal harvest ages for Pinus spp. and Eucalyptus spp. stands. The planning horizon was five years with annual periodicity. The study area was 23,330 hectares of forests, located in Paraná state (southern Brazil). We compared the simulated scenarios according to the following parameter indicators: harvest income, building road network and the production unit cost. The decreasing of the minimal harvest age reduces the mean production of management units scheduled to be harvested, in other hand, it requires fewer roads to be built, and consequently increases the production unit cost. The solutions obtained by using ILP models presented an optimality gap lower than 0.1%.
dc.formatapplication/pdf
dc.identifier0104-7760
dc.identifierhttps://www.redalyc.org/articulo.oa?id=74445561008
dc.identifier.urihttp://hdl.handle.net/123456789/421597
dc.languageen
dc.publisherUniversidade Federal de Lavras
dc.relationhttp://www.redalyc.org/revista.oa?id=744
dc.rightsCERNE
dc.sourceCERNE (Brasil) Num.1 Vol.22
dc.subjectAgrociencias
dc.titleFOREST HARVEST SCHEDULING PLAN INTEGRATED TO THE ROAD NETWORK
dc.typeartículo científico

Archivos