An Analysis of the Tradeoffs between Policy Instruments to Induce Dairy Producers in California to Participate in a Centralized Digester
No hay miniatura disponible
Fecha
Título de la revista
ISSN de la revista
Título del volumen
Editor
Resumen
Descripción
Tradeoff between different utility rates and policy intervention to induce dairy producer to join a regional digester are studied. Results demonstrate that a regional digester for the dairy industry in California is feasible given the digester receives $0.05 per kWh and government intervention or $0.0925 per kWh with no intervention.
