Mali : The Selingue Rehabilitation Project
No hay miniatura disponible
Fecha
Autores
Título de la revista
ISSN de la revista
Título del volumen
Editor
World Bank, Washington, DC
Resumen
Descripción
The main objective of this project
(1996-2002), assisted by both the World Bank and the
European Investment Bank, with an initial IDA credit of US$
27.50 million, which rose to US$ 34.21 million equivalent
due to exchange rate fluctuation, was to repair and
rehabilitate the Selingue Hydropower plant built 26 years
ago. Other objectives were: (i) maintain the electricity
supply/demand balance by increasing the thermal capacity of
the system and implement an energy-efficient program; (ii)
improve the capacity of the Energie du Mali (EDM) to
properly operate, maintain and supervise its power
generation facilities; and (iii) prepare a long-term
institutional framework and regulatory system for the power
sector and privatize EDM.
Palabras clave
REHABILITATION PROJECTS, CONCESSION AGREEMENT, DRAINAGE, FINANCIAL VIABILITY, FISHING, INSTITUTION BUILDING, INSTITUTIONAL DEVELOPMENT, INSTITUTIONAL FRAMEWORK, JOINT VENTURE, LEGAL FRAMEWORK, NEEDS ASSESSMENT, PRIVATE OPERATOR, PUBLIC UTILITIES, QUALITY OF LIFE, REGULATORY AUTHORITY, REGULATORY FRAMEWORK, REGULATORY SYSTEM, REHABILITATION, SOCIAL COSTS, SUSTAINABLE DEVELOPMENT, WATER RESOURCES, WATER RESOURCES MANAGEMENT, EXCHANGE RATE FLEXIBILITY, ELECTRICITY SUPPLY SERVICES, THERMAL ENERGY, ENERGY EFFICIENCY INITIATIVES, POWER GENERATION, INSTITUTIONAL FRAMEWORK, POWER SECTOR, PRIVATIZATION, LEGAL FRAMEWORK, TRAINING ACTIVITIES, MANAGEMENT PROGRAMS COMPETITIVE BIDDING