Brackishwater Fisheries Research Station (BFRS): Design, phase 2

dc.coverageBangladesh
dc.creatorDr. J. Muir and Dr. M. Karim;Fisheries and Aquaculture Management Division
dc.date2023-10-05T10:33:21Z
dc.date2023-10-05T10:33:21Z
dc.date1987
dc.date2020-11-10T18:42:37.0000000Z
dc.date.accessioned2026-06-28T01:43:52Z
dc.descriptiona) This report provides the final description of the design of the BFRS; and completes part 2 of the consultants assignment to the project. (b) A design is provided for the site selected at Paikgacha, Khulna district, comprising layouts of ponds, laboratory, administrative and service facilities, specifications for facilities, services, and installed equipment, and details of significant engineering requirements for successful development. In addition, a budget costing is provided for contract guidance and assisting in allocation of funds. A timetable of development is also included, defining the critical points in the completion of the project. (c) A draft tender notification is provided for local consultant engineers, together with terms of reference and a schedule of work, and a design/supervision timetable. (d) The main points to note are: The site is suitable for the requirements defined in the research programme, and meets the site selection criteria well. Additional si te area is required for provision of fill material for main walls, as the site is relatively low-lying. Final layouts may be affected by detailed results of soil bearing tests and of freshwater availability. Timing of development is particularly critical: unless clear and decisive executive control is exercised, it will be difficult to complete significant construction work within the 1986/87 dry season. The accompanying figure demonstrates the critical points in the early development of the project. At present (1986) price levels, the project development is estimated to cost around 100110% of specifically allocated funds. This cannot necessarily be guaranteed if long delays occur. As presently specified, the design fulfills the requirements of the main defined research objectives in a reasonably efficient and cost-effective manner. Project costs can be reduced, but only at the cost of compromising some of these objectives.
dc.formatp.125
dc.identifierhttps://openknowledge.fao.org/handle/20.500.14283/AC365E
dc.identifierhttp://www.fao.org/3/a-ac365e.htm
dc.identifier.urihttp://hdl.handle.net/123456789/344516
dc.languageEnglish
dc.rightsFAO
dc.titleBrackishwater Fisheries Research Station (BFRS): Design, phase 2
dc.titleBrackishwater Fisheries Research Station (BFRS): Design, phase 2
dc.titleAssistance to the Second Agricultural Research Project, Bangladesh
dc.titleAssistance to the Second Agricultural Research Project, Bangladesh
dc.typeProject

Archivos