Re-engineering closing watersheds: the negotiated expansion of a dam-based irrigation system in Bolivia

dc.creatorLópez, R.R.
dc.creatorVincent, L.
dc.creatorRap, Edwin
dc.date2015-01-02
dc.date2015-03-17T14:39:55Z
dc.date2015-03-17T14:39:55Z
dc.date.accessioned2026-06-27T18:43:31Z
dc.descriptionThe expansion of the Totora Khocha dam-based irrigation system in the Pucara watershed is a case of planned re-engineering of a closing watershed. This article shows how, when irrigation systems expand in space and across boundaries to capture new water, they also involve new claims by existing and emergent users. This results in complex processes of design, contestation and negotiated redesign, where irrigation projects are being produced by the negotiated construction of water networks. Therefore, the design process in a closing watershed is better approached as a dynamic and negotiated process of engineering than as a prescriptive mode of network building.
dc.identifierhttps://hdl.handle.net/10568/58405
dc.identifier.urihttp://hdl.handle.net/123456789/163763
dc.languageen
dc.publisherInforma UK Limited
dc.rightsOpen Access
dc.sourceLopez, R. R.; Vincent, L.; Rap, Edwin. 2014. Re-engineering closing watersheds: the negotiated expansion of a dam-based irrigation system in Bolivia. International Journal of Water Resources Development, 16p. (Online first). doi: https://doi.org/10.1080/07900627.2014.908349
dc.subjectirrigation systems
dc.subjectirrigation programs
dc.subjectirrigated land
dc.subjectwatersheds
dc.subjectdams
dc.subjectreservoirs
dc.subjectwater supply
dc.subjectnetworks
dc.subjectcase studies
dc.titleRe-engineering closing watersheds: the negotiated expansion of a dam-based irrigation system in Bolivia
dc.typeJournal Article

Archivos